Information

ESTADIO DE BÉISBOL HUGO CHÁVEZ

Basic shortcuts

Ctrl + SSave subtitles
Ctrl + click
Double click
Edit highlighted caption
TabEdit next caption
Shift + TabEdit previous caption
EscLeave edit mode
Ctrl + SpacePlay / pause video
Ctrl + HomePlay selected caption
Ctrl + EnterSplit caption at cursor position
at current time

Advanced shortcuts

Ctrl + InsertAdd new caption
Ctrl + DeleteDelete selected caption
Ctrl + IEdit currently played segment
Shift + EnterNew line when editing
Ctrl + LeftPlay from -1s
Ctrl + RightPlay from +1s
Alt + LeftShift caption start time -0.1s
Alt + RightShift caption start time +0.1s
Alt + DownShift caption end time -0.1s
Alt + UpShift caption end time +0.1s

Annotation shortcuts

Ctrl + 1Hesitation
Ctrl + 2Speaker noise
Ctrl + 3Background noise
Ctrl + 4Unknown word
Ctrl + 5Wrong segment
Ctrl + 6Crosstalk segment
You are in the read-only mode. Close
00:28.2
00:37.5
And in our program 360, it can be found, in this opportunity, one of the macro building sites that is being done thanks to the China-Venezuela agreement.
00:37.6
00:44.2
We refer to the baseball stadium as the park of Hugo Chavez, which is going to be one of the biggest in Latin America.
00:44.3
00:53.2
But, in order to know in detail of what this building site we are accompanied, at this starting hour of the portfolio of public works, Admiral Salazar Coll, welcome minister.
00:53.3
01:07.6
Well, many thanks Boris, here I send my regards to the Venezuelan people and, as always, through those screens inform the Venezuelan people of this grand macro building site that only the Bolivarian Revolution dares to build,
01:07.7
01:17.2
searching for the wellbeing and all the places of entertainment that don’t always come to contribute with sport, but also with tourism for the entertainment of the people.
01:17.3
01:23.3
Here we are in the park Hugo Chavez, this is the baseball stadium, one of the installations that will come to conform this park,
01:23.4
01:35.2
and this park began with a huge soil movement, there were 3 million cubic meters of dirt that were moved here, because if we see this, it was a total hill.
01:35.3
01:50.6
And so, to find the space, it had to be profiled, but beyond that also began, once the movement of the soil began, with the slope stabilization and the construction of all the superficial drainage systems.
01:50.7
02:03.8
Here we have screens strapped, we have terrace systems as well, and furthermore we have a protection system with geotextil nets.
02:03.9
02:12.7
Notably, and importantly to point out, that the superficial drainage systems are going to be connected to a rainwater recollection tank,
02:19.0
02:26.0
which is going to serve and it is going to feed the irrigation system of the grass, which is natural, of the baseball park Hugo Chavez Frias.
02:26.1
02:30.9
Minister, let’s try to illustrate to our audience that maybe has heard a lot about this stadium,
02:31.0
02:35.8
but perhaps has neither been able to perceive its general characteristics
02:35.9
02:40.7
beyond the theme of how the irrigation system is being implemented. Let’s go more general:
02:40.8
02:45.6
What is the surface of the stadium? How many people will be able to enjoy it?
02:45.7
02:50.5
And beyond it all, why is it important? -Well, yes, about the importance, I already said it.
02:50.6
02:55.4
It comes to mark a myth a stadium like this in Latin America,
02:55.5
03:00.3
internal boulevards with 34,911 spectators that when sitting in their places are going to be there in booth style seats,
03:00.4
03:05.2
but we can come to a maximum of 40,000 people
03:05.3
03:10.1
as well because we have some internal boulevards, and one in the center field, and
03:10.2
03:15.0
beyond that, between the hallways and between the steps as well there is
03:15.1
03:19.9
enough spreading with respect to that as well. This park within
03:20.0
03:24.8
the frame of building sites, and speaking in the sense of civil engineering, had
03:24.9
03:29.7
a perfectly consolidated ground, and for such,
03:29.8
03:34.6
thus the majority of its direct foundations except for a
03:34.7
03:39.5
small sector that is piloting there, there were
03:39.6
03:44.4
6,000 tons of steel and 70,000 cubic meters of concrete!